Costin Roe Consulting successfully designed the lifting beam for the raising of continuous 60 to 70 metre-long Kingspan insulated roof panels at APEC Haus, the US$37 million Leaders’ Conference Centre being constructed at Port Moresby, Papua New Guinea, in preparation for the APEC Summit to be held in November 2018. APEC Haus has been cited in […]
Understanding the new context of risk in structural engineering: BIM and AI
Lifting the lid on APEC Haus PNG for APEC Summit 2018
Costin Roe Consulting successfully designed the lifting beam for the raising of continuous 60 to 70 metre-long Kingspan insulated roof panels at APEC Haus, the US$37 million Leaders’ Conference Centre being constructed at Port Moresby, Papua New Guinea, in preparation for the APEC Summit to be held in November 2018. APEC Haus has been cited in […]